GPS Engineering increases its covered spaces to 3000 square meters
In total safety, although in full Covid-19 pandemic, the intervention works for the extension of GPS ENGINEERING industrial plant begin with an increase of the covered area up to a total of 3000 square meters distributed in:
- loading / unloading area;
- production / assembly area;
- painting area;
- special gearbox testing area;
- spare parts warehouse;
- storage of new gears ready for prompt delivery.